• Facebook
  • Instagram
  • WhatsApp
Login To Portal
  • About Us
  • Services
    • Environmental Consultancy
      • Environmental Clearance for Various Sectors as per NABET scheme
      • Coastal Regulation Zone (CRZ)
      • High rise Clearance
      • CGWA NOC
      • Wildlife Clearances
      • Traffice Impact Study
      • Disaster Management Plan (DMP)
      • Heat Island Studies
      • High Rise studies
    • Water & Wastewater Services
      • Consultancy & Designing
      • AUTOCAD Layout , Planning & Engineering (GA and Structure)
      • Compact Sewage Treatment Systems
      • Sewage Treatment Plants (Domestic)
      • Effluent Treatment Plants (Industrial)
      • Common Effluent Treatment Plants
      • Zero Liquid Discharge Systems
      • Water Treatment Plants
      • Reverse Osmosis/ Ultrafiltration
      • Single/Multi Effect Evaporator
      • Rainwater Harvesting
      • Refurbishment of ETP
      • Bio-mass Development in Secondary Treatment Systems for ETP/ STP
      • Operation and Maintenance of ETP/ STP
      • Preparation of Feasibility Reports for ETP/ STP
      • Solid Waste Management– Storage and Treatment
    • Laboratory Testing Services
      • Food testing
      • Hand Swab Analysis
      • Sensory Evaluation
      • Heavy metals pesticides
      • Animal feed Testing
    • Compliance Services
      • Enviro-Audit
      • No Increase in Pollution Load Certification
      • Post Clearance
      • Compliance Report
      • Consent Management
    • ESG Sustainability
      • Green Building Certification (LEED, IGBC and GRIHA)
    • Food Safety Testing
    • Audit
  • Certification
  • Careers
  • Contact Us

Environmental Consultancy

OVERVIEW

Environmental Clearance for Various Sectors as per NABET scheme

We assist organisations in obtaining Environmental Clearance (EC) for projects across a wide range of sectors in accordance with the standards of the NABET-accredited process. Environmental Clearance is a key regulatory requirement for many development projects under the framework of the Environmental Impact Assessment Notification, 2006 & its subsequent amendements issued by the Ministry of Environment, Forest and Climate Change.

Our team of experienced environmental consultants provides comprehensive, end-to-end support throughout the EC process. This includes project screening and scoping, baseline environmental data collection, impact assessment, preparation of Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) reports, coordination with regulatory authorities, stakeholder consultation, and final submission for appraisal and approval. By following a structured and systematic approach, we help project proponents navigate complex regulatory procedures efficiently while ensuring full environmental compliance.

Through adherence to the NABET accreditation framework, all EIA-related activities are carried out using approved methodologies, standardized procedures, and recognised quality benchmarks. This ensures transparency, technical accuracy, and regulatory acceptance of the studies conducted.

With our technical expertise and regulatory understanding, we support organisations in achieving timely Environmental Clearance approvals while promoting environmentally responsible and sustainable project development across sectors such as infrastructure, industry, energy, mining, and urban development.

WHAT WE OFFER

Specialised Services For Efficient Environmental Clearance

Preparation of Detailed EIA/EMP Reports

We prepare comprehensive Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) reports in accordance with the requirements of the Environmental Impact Assessment Notification, 2006 issued by the Ministry of Environment, Forest and Climate Change. Our reports include baseline environmental studies, impact identification, mitigation measures, and environmental management strategies to ensure that projects comply with regulatory standards while minimizing environmental impacts.

Site Assessments and Feasibility Evaluation

Our team conducts detailed site assessments and environmental feasibility studies to evaluate the suitability of project locations. This involves analyzing environmental sensitivities, land use patterns, ecological features, and regulatory constraints to identify potential risks and ensure that projects are planned in an environmentally responsible and sustainable manner.

Coordination with Regulatory Bodies

We facilitate effective coordination with key regulatory authorities including the Ministry of Environment, Forest and Climate Change, Central Pollution Control Board, and State Environment Impact Assessment Authorities. Our team ensures timely communication, submission of required documents, and clarification of technical queries during the appraisal process to help streamline project approvals.

Public Hearing Facilitation and Stakeholder Engagement

Public consultation is a critical part of the Environmental Clearance process. We assist in organizing and facilitating public hearings, preparing required documentation, and engaging with local communities, stakeholders, and authorities. This process ensures transparency, addresses concerns raised by affected communities, and integrates their feedback into the project planning process.

Compliance with MoEF&CC and CPCB Guidelines

All project studies and documentation are prepared in accordance with the guidelines issued by the Ministry of Environment, Forest and Climate Change and the Central Pollution Control Board. We ensure that environmental standards, monitoring protocols, and regulatory procedures are fully complied with to maintain credibility and regulatory acceptance of project submissions.

Submission, Follow-ups, and Approval Management

Our services extend beyond documentation to include complete submission and approval support. We manage the submission of applications through appropriate regulatory portals, track the progress of approvals, coordinate with authorities for clarifications, and conduct follow-ups to ensure timely Environmental Clearance for project proponents

Talk To Our Experts

WHY CHOOSE US

Trusted Expertise Backed By Decades Of Experience

With decades of hands-on industry experience, Enviro Group brings together certified specialists, advanced infrastructure, and proven processes to deliver dependable environmental solutions. Our approach blends regulatory understanding with scientific accuracy, ensuring every project meets the highest quality and compliance standards. From analysis to execution, we provide guidance you can trust, outcomes you can measure, and support you can rely on.

Certified Experts

Our team consists of qualified environmental professionals, certified specialists, and experienced consultants who possess deep technical knowledge of environmental regulations, impact assessment methodologies, and compliance frameworks. With expertise aligned to the standards of the National Accreditation Board for Education and Training and regulatory requirements set by the Ministry of Environment, Forest and Climate Change, we deliver reliable guidance and high-quality environmental consulting services.

End-To-End Capabilities

We provide comprehensive support across the entire project lifecycle, from initial project screening and feasibility analysis to preparation of EIA/EMP reports, regulatory coordination, and post-approval compliance. Our integrated approach ensures that every stage of the environmental clearance process is handled seamlessly, enabling clients to focus on project development while we manage regulatory requirements efficiently.

Data-Driven Approach

Our work is supported by scientific analysis, field studies, and reliable environmental data to ensure accurate assessments and informed decision-making. By applying systematic methodologies, advanced analytical tools, and regulatory frameworks such as the Environmental Impact Assessment Notification, 2006, we help clients understand environmental risks, evaluate alternatives, and implement effective mitigation strategies.

Reliable Delivery

We are committed to timely execution, transparency, and consistent project management. Our team closely monitors project milestones, regulatory timelines, and documentation requirements to ensure smooth progress and successful approvals. By maintaining clear communication and proactive follow-ups with authorities such as the Central Pollution Control Board and relevant state agencies, we ensure dependable and result-oriented service delivery.

OUR PROCESS

Our Approach To Every Project

We follow a structured, transparent, and outcome-focused process that ensures regulatory clarity, technical precision, and sustainable project success. Each stage is designed to minimize risks, accelerate approvals, and deliver reliable environmental solutions.

Initial

Assessment

The process begins with a detailed initial assessment of the proposed project, where our experts review project objectives, regulatory applicability, and environmental considerations. This stage involves understanding project scope, identifying applicable environmental regulations, and determining the level of assessment required under the Environmental Impact Assessment Notification, 2006 issued by the Ministry of Environment, Forest and Climate Change. This step helps establish a clear roadmap for the environmental clearance process.

Site

Evaluation

Our team conducts comprehensive site evaluations and field surveys to collect baseline environmental data. This includes assessment of air quality, water resources, land use, biodiversity, and surrounding socio-economic conditions. The information gathered during this stage forms the foundation for environmental impact analysis and ensures that project planning considers local environmental sensitivities.

Documentation &

Analysis

Based on the collected data, we prepare detailed technical documentation, including Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) reports. This stage involves impact prediction, risk analysis, and development of mitigation measures to ensure that projects comply with regulatory standards and follow guidelines established by the Central Pollution Control Board and the Ministry of Environment, Forest and Climate Change.

Submission

Coordination

Once the documentation is finalized, we handle the submission of applications and technical reports to the relevant regulatory authorities. Our team coordinates with appraisal committees, government departments, and environmental authorities to address queries, provide clarifications, and ensure that the review process progresses smoothly and efficiently.

Final

Clearance

The final stage focuses on obtaining the Environmental Clearance approval from the competent authority and ensuring that all regulatory conditions are met. We also provide guidance on post-approval compliance, environmental monitoring, and reporting requirements to support clients in maintaining long-term regulatory compliance and sustainable project operations.

Start Your Project

CONTACT US

Let’s Build A Sustainable Future





    Company

    • Home
    • About Us
    • Services
    • Certification
    • Careers
    • Contact Us
    • Applications
    • Life @ Enviro
    • Blogs & Insights

    Contact

    +91 22-2854-1647 / 48 / 49 / 67 / 68
    +91 22-2854-1290
    info@eaepl.com
    www.eaepl.com
    B – 1003, Enviro House, 10th Flr.,Western Edge II, W. E. Highway,Borivali (E), Mumbai – 66

    Subscribe